Първоначално изпратено от Pyramid
Разгледай мнение
JV фонд за 100% финансиране(до фаза feasibility study) на стартиращ-проект геоложко-проучване метали (Cu/Ag) in Ghanzi - Kalahari copper belt in North West Botswana - covering approximately 1800 km2
BACKGROUND
Morupule South Coal Project-2010 Botswana,covering approximately 246 km2
• 2.45 Billion tons JORC Gross in situ coal resource tonnage
• 1.2 Billion tons openpit, with indicative insitu coal to overburden ratios ranging 1.5-2.7
• 283Mt measured and indicated JORC coal resource (expected to be doubled with the results of the latest core diamond drilling).
• Export quality thermal coal(middling’s for domestic power generation)
Коментар